OUR PROJECTS

Delivering Water & Energy Solutions Across Uganda

Hundreds of completed projects — from single-household boreholes to large-scale community water supply schemes.

150+Projects Completed

150+

Boreholes Drilled

80k+

People Served

45+

Districts Covered

98%

Success Rate

Borehole Drilling

Wakiso District Community Borehole
Borehole Drilling

Wakiso District Community Borehole

  • Depth: 95 metres
  • Serves 650 households
  • Submersible pump with elevated tank
  • Completed in 14 days
Mukono School Solar Borehole
Borehole Drilling

Mukono School Solar Borehole

  • Depth: 110 metres
  • Solar-powered pumping system
  • Serves 1,200 students and staff
  • Zero recurring energy cost
Namanve Industrial Zone Borehole
Borehole Drilling

Namanve Industrial Zone Borehole

  • Depth: 145 metres
  • Yield: 8 m³/hr
  • Industrial-grade pump installation
  • 24/7 factory water supply

Borehole Rehabilitation

Gulu District Rehabilitation Programme
Borehole Rehabilitation

Gulu District Rehabilitation Programme

  • 3 boreholes rehabilitated
  • 3,200 direct beneficiaries
  • New pumps and rising mains installed
  • Community maintenance training provided

Irrigation Systems

Mbarara 8ha Drip Irrigation Project
Irrigation Systems

Mbarara 8ha Drip Irrigation Project

  • 8 hectares under drip irrigation
  • 50% water savings vs flood irrigation
  • 3x revenue increase for farmers
  • Solar-powered fertigation system
Lira 20ha Sprinkler Irrigation Scheme
Irrigation Systems

Lira 20ha Sprinkler Irrigation Scheme

  • 20 hectares covered
  • 40 families benefiting
  • Automated sprinkler scheduling
  • Borehole-fed water supply

Solar Water Systems

Karamoja School Solar Water System
Solar Water Systems

Karamoja School Solar Water System

  • 480 pupils served daily
  • Zero energy cost
  • 5,000-litre elevated storage tank
  • Fully off-grid operation

Water Treatment

Fort Portal Hotel Iron Removal Plant
Water Treatment

Fort Portal Hotel Iron Removal Plant

  • Iron reduced from 3.8 to 0.05 mg/L
  • Manganese and turbidity removal
  • Automated backwash system
  • Serves 120-room hotel facility

Ready to Start Your Project?

Contact us for a free site assessment and detailed quotation.